Featured Job of the Month – March

Berry Plastics – Schaumburg, IL

Project: Interior Ceiling, Walls, Floor

There were 3 phases to this project, all of which had to be accomplished under a very tight time frame.

First Phase: Priming the fiberglass ceiling tiles and applying two coats of finish.

Second Phase: Applying two coats of water based catalyzed epoxy on the walls for chemical, stain resistance and wash ability.

Third Phase: Completely removing the existing epoxy floor and installing an impact resistant, chemical resistant, and slip resistant industrial coating on the floor.

Take a look at the before and after pictures:

combine_images

 

combine_images