Featured Job of the Month – December

Piers 2 – Woodridge, IL 

Project – Interior Hallways 

 

before-after stairs

We had the pleasure working with this customer to update the interior hallways of their buildings. They opted to change the existing brown trim to white which drastically brightened up the space.

After sanding all of the glossy surfaces to ensure adhesion of the new coating, the damaged drywall areas were patched, sanded and primed. We removed the existing door and window casing and base trim and replaced with primed window casing and base trim. We also added a new primed pine chair rail to the walls in the main hallways to add some depth and design to the area. The ceilings were given a fresh coat of paint, as well as the interior side of the main entry doors, and both sides of the interior security doors. The wrought iron railings were also coated.

We are confident the homeowners will love coming home to this updated space.